by Gary Elliott | Feb 24, 2022 | Case Studies, Wet Pour
Devonshire Primary Academy, Play Surfacing Product: Play Area Surfacing Budget: £100,000 Brief: Devonshire Primary Academy School wanted to transform their playground by adding wet pour surfacing with various colours and play equipment. They requested that their area...
by Gary Elliott | Feb 23, 2022 | Case Studies, Wet Pour
Ashby and Lamas Splash Park Product: Water Park Surfacing Budget: £60,000 + VAT Brief: The client were looking to refurbish their exisiting splash park as the surface had become old, dirty and covered in algae. Surfacing Installed: Wet pour was laid at 20mm in black...
by Gary Elliott | Oct 12, 2017 | Case Studies, Wet Pour
Wilton Lodge Adventure Playground, Play Surfacing Product: Play Area Surfacing Budget: £87,000 Brief: To install safety surfacing to the clients chosen design supplied by the appointed Play Providers. The design incorporates many colours, graphics and mounds to...
by Gary Elliott | Oct 3, 2017 | Case Studies, Wet Pour
Cherry Orchard Academy, Kent, Wet Pour Product: Wetpour Safety Surfacing Budget: £15,000 Brief: A state of the art two-form entry primary academy opening in September 2017. Located at the Ebbsfleet Garden city development in Kent. The architects wanted to...
by Gary Elliott | Oct 3, 2017 | Case Studies, Wet Pour
Wetpour was the perfect surface to give St Dunstan’s the wow factor with their new playground. We were able to incorporate numbers and letters with the surface as well as games and line up circles with each classrooms initials. The much loved old roadway markings were...
by Gary Elliott | Aug 17, 2017 | Case Studies, Wet Pour
Wetpour was the perfect surface to give St Dunstan’s the wow factor with their new playground. We were able to incorporate numbers and letters with the surface as well as games and line up circles with each classrooms initials. The much loved old roadway markings were...